HAZOP / HAZID / What-If etc. (PHA)
structured techniques like HAZOP and HAZID, we support clients in identifying hazards during design, operation, and modification phases. These workshops bring together multidisciplinary teams to analyze risks.
Inherently Safer Design Review (ISD)
Our ISD reviews ensure hazards are minimized at the design stage itself. We apply principles of substitution, minimization, and simplification. Safer alternatives are identified through systematic screening.
Environmental Impact Identification (ENVID)
ENVID identifies environmental aspects, impacts, and hazards in project activities. It helps develop control measures to minimize environmental damage. The process ensures compliance with regulations and promotes sustainable design.
Occupational Health Impact Identification (OHID)
OHID recognizes occupational health hazards affecting workers in projects. It evaluates risks from physical, chemical, and ergonomic factors. The process ensures health protection through proper controls and preventive measures.
Bow-Tie Analysis
Bow-Tie Analysis, conducted through workshop facilitation, visually links potential hazards, threats, and consequences to identify key risk controls. The collaborative workshop approach ensures multidisciplinary input for more accurate and practical outcomes. It helps teams strengthen preventive and mitigative barriers, enhancing overall safety management.
Safety Integrity Level Assessments (SIL)
Our SIL assessments ensure safety-instrumented systems meet required integrity levels. We define critical safety functions and determine SIL levels using quantitative or qualitative methods.
Project HSE Review (PHSER)
At major project milestones, our Project HSE Review identifies and addresses risks systematically. This ensures no hazard is overlooked in key gateways. By doing so, safety, health, and environmental concerns remain prioritized.
Constructability Reviews
Our constructability reviews integrate HSE, operations, and construction expertise early in projects. We evaluate installation sequences to minimize risks and delays. Special focus is given to access, scaffolding, and utilities at height.
Simultaneous Operations (SIMOPS)
When live operations coincide with modifications or maintenance, SIMOPS workshops help mitigate risks. We identify conflicting operations that may create hazards
Manual of Permitted Operations (MOPO)
The Manual of Permitted Operations (MOPO) defines the relationship between ongoing operations and other simultaneous activities. It identifies potential restrictions to prevent conflicts and ensure safe coordination. The document also establishes specific risk control measures to maintain operational integrity and safety compliance.
Our MOPO workshops apply a structured method to maintain control under both normal and off-design conditions. Risk control checks and procedural compliance are reinforced.
ALARP Demonstration
We help stakeholders evaluate whether controls meet ALARP (As Low As Reasonably Practicable) standards. This involves risk matrices, cost-benefit analysis, and engineering justification.
Deliverables
• HAZOP workshop report
• HAZID workshop report
• ISD workshop report
• ENVID workshop report
• OHID workshop report
• SIL determination workshop report
• Bow-Tie workshop report and HSECES Identification list
• PHSER workshop report
Activities
• Review of project documentation
• Pre-alignment discussions with clients
• Preparation of work packs including terms of references
• Structured brainstorming sessions
Please get in touch with our specialist.